I-4 Ultimate Project (2024)

I-4 Ultimate Project (1)

Project Type

Roads and Bridges

Financing Type

TIFIA

Status

Credit Agreement Executed

Sponsor/Borrower

Florida Department of Transportation (FDOT); I-4 Mobility Partners

Project Description

The I-4 Ultimate project is the reconstruction and widening of 21 miles of I-4 from west of Kirkman Road in Orange County, Florida through downtown Orlando to east of State Road 434 in Seminole County. This public-private partnership (P3) project will: fully reconstruct the existing general purpose lanes; add four express toll lanes in the median; reconstruct 15 major interchanges; and reconstruct, construct, or widen 140 bridges.

The existing general purpose lanes, which range from three to four lanes in each direction, are approximately 50 years old and experience significant levels of congestion. The Florida Department of Transportation (FDOT) will set toll rates and collect all revenue. Access and egress will be provided at five exchange areas (crossover zones) and by direct connectors at major intersections.

The project includes numerous aesthetic treatments, including a pedestrian bridge, accent lighting, fountain illumination, art sculptures and monuments, and other architectural treatments. According to the Project Sponsor, congestion and travel time will be reduced through the addition of four Express Lanes and improved interchange capacity, resulting in a projected average travel speed increase of approximately 15 miles per hour in the peak hours for drivers in the general use lanes. The project will also implement numerous safety enhancements, including but not limited to the widening of shoulders, removal of weaving sections and left-hand exits, and improvements to interchange signaling, which are estimated to reduce the number of crashes by 13 percent. The project is expected to generate $1.8 billion in economic development benefits and create approximately 2,000 jobs. By using TIFIA financing and utilizing the P3 delivery method, the Florida Department of Transportation estimates that they will complete the project 25 years sooner and with financing savings of approximately $250 million in net present value when compared to conventional financing methods.

Project Link

Project Details

TIFIA Assistance

$949.00M

Primary Revenue Pledge

Availability Payments

Project Cost

$2877.00M

Fiscal Year Closed

FY2014

Duration/Status

I-4 Mobility Partners was selected by FDOT as the preferred bidder on April 23, 2014. Construction began in February 2015; substantial completion is expected in February 2022.

Funding Sources

Senior Bank Debt: $484M
TIFIA Tranche A Loan: $127.291M
TIFIA Tranche B Loan: $822.174M
Equity Contribution: $103.5M
FDOT Milestone Payments during Construction: $1,035M
TIFIA Capitalized Interest and Interest Income: $136.8M
Financial Acceptance Payments $168.4M

Project Delivery/Contract Method

DBFOM (Design-Build-Finance-Operate-Maintain)

Project Participants

I-4 Mobility Partners: John Laing Investments Limited (29% equity partner, 50% project owner); I-4 Mobility Partners: Skanska Infrastructure Development (71% equity partner, 50% project owner); Design-build joint venture: Skanska USA Civil Southeast, Inc.

Project Advisers/Consultants

To Sponsor (FDOT):

Nossaman - Legal Advisor
KPMG - Financial Advisor
Reynolds Smith and Hill - Technical Advisor
To the Borrower (I-4 Mobility Partners):

Société Générale - Financial Advisor
Ashurst - Legal Advisor
To USDOT TIFIA JPO:

TIFIA Legal Advisor: Hawkins Delafield & Wood
TIFIA Financial Advisor: Scully Capital Services, Inc.

Project Lender

USDOT TIFIA; Société Générale - Sr. Bank Debt; MUFG - Sr. Bank Debt; Canadian Imperial Bank of Commerce - Sr. Bank Debt; Canadian Imperial Bank of Commerce - Sr. Bank Debt; Svensk Exportkredit - Sr. Bank Debt; Credit Agricole - Sr. Bank Debt

Credit Assistance Detail

Direct loan: $949.465 million; the TIFIA loan is structured in two tranches: $127.291 million of TIFIA debt (TIFIA Tranche A) will be repaid in full by the second Final Acceptance Payment from FDOT in 2021; and $822.174 million of TIFIA debt (TIFIA Tranche B), which is repaid from the Availability Payments made by FDOT through final maturity in 2052.

Financial Status

Financial close occurred and TIFIA credit agreement was executed in September 2014. Tranche A interest and principal payments are anticipated to start in 2023. Tranche B interest and principal payments are expected to start in 2021. Final loan maturity is expected to occur in 2021 for Tranche A and 2052 for Tranche B.

Innovations

The project includes numerous aesthetic treatments, including a signature pedestrian bridge, accent lighting, fountain illumination, art sculptures and monuments, and other architectural treatments
The project incorporates 25 approved technical concepts that exceed the minimum requirements established by FDOT for basic configuration, project scope, and design criteria. These include innovations in traffic flow, safety, community connections, sustainability, and use of technology. Further detail can be found on theproject website.

Application Details

Applicant

Florida Dept. of Transportation

LOI Fiscal Year Received

FY2013

LOI Received Date

Application Received Fiscal Year

FY2013

Credit Agreement Executed

Initial Eligibility Review

Review complete

Creditworthiness Review

Review complete

Application Review

Review complete

Estimated Project Cost

$2877.00M

TIFIA Request

$949.00M

Instrument Type

Direct Loan

I-4 Ultimate Project (2024)
Top Articles
Latest Posts
Article information

Author: Chrissy Homenick

Last Updated:

Views: 6043

Rating: 4.3 / 5 (54 voted)

Reviews: 85% of readers found this page helpful

Author information

Name: Chrissy Homenick

Birthday: 2001-10-22

Address: 611 Kuhn Oval, Feltonbury, NY 02783-3818

Phone: +96619177651654

Job: Mining Representative

Hobby: amateur radio, Sculling, Knife making, Gardening, Watching movies, Gunsmithing, Video gaming

Introduction: My name is Chrissy Homenick, I am a tender, funny, determined, tender, glorious, fancy, enthusiastic person who loves writing and wants to share my knowledge and understanding with you.